Design authority, precision manufacturing, avionics integration, and environmental qualification testing — structured under one AS9100 Rev D-certified QMS, executed by one engineering organization with a single point of accountability from first drawing release through FAA 8130-3-tagged shipment. We eliminate the handoff risk that fragments traditional aerospace supply chains.
CATIA V5/V6, ANSYS FEA/CFD, MBSE on IBM DOORS NG — full design authority from concept through DRB-approved production release. Deliverables: ASME Y14.5-2018 GD&T drawing sets, FEA margin summaries to MMPDS-12, FMEA/FTA per SAE ARP4761, and DVPs cross-referenced from MIL-HDBK-5 through ECSS-E-ST-32. PLM version control. Complete audit trail.
Five 5-axis CNC centers — DMG Mori DMU 75 & Mazak VARIAXIS i-700 — holding ±0.013mm on Ti-6Al-4V, Inconel 718, 7075-T7351, and 15-5PH. Zeiss CONTURA G2 CMM at 0.7 µm independently verifies every CTF dimension. 18,000 sq/ft composite cell: Cincinnati Viper 6000 AFP, 6.0m × 3.2m autoclave at 400°F/350 psig with 72-channel cure monitoring. NADCAP AC7118/4 Merit Status.
4,200 sq/ft ISO Class 7 cleanroom — ≤10,000 particles/ft³, 68°F ±2°F, +12.5 Pa. IPC-A-610 Class 3 CIS-certified technicians. Harness fab per MIL-DTL-22759 / AS22759/87. MIL-DTL-38999 Series III and MIL-DTL-83513 connectors with contact force verification. ARINC 429, MIL-STD-1553B, AFDX, CAN bus integration — 100% functional test before shipment. FOD prevention per AS9132.
In-house: 3,000 lbf shaker (20–2,000 Hz, 3,000g SRS), Tenney thermal −73°C to +175°C, Thermotron thermal vacuum to 10⁻⁶ torr, He leak detection to 1×10⁻⁸ scc/sec. NDT: PAUT, computed radiography, PT/MT/ET — ASNT Level II/III. MIL-STD-810H, DO-160G, NASA-HDBK-7005, GEVS-7000A. Zero test escapes in four consecutive qualification programs.
From single prototype First Articles to long-term rate production agreements and classified defense programs — our engagement structure is transparent, traceable, and built for the way aerospace procurement actually works.
340,000 sq/ft of AS9100-certified manufacturing, cleanroom, and test infrastructure — purpose-built for flight-critical production.
Submit your RFQ or RFI and receive a formal technical feasibility assessment and preliminary cost proposal within 5 business days. ITAR Agreements and NDAs executed before receipt of controlled drawings. Customer source inspection accommodated at every scheduled hold point. Your hardware. Our accountability.